Certainty From First Sketch to Everyday Life

The Borland Method

For private owner-occupiers planning a premium forever home, most architects stop at drawings. We go further, verifying performance, managing costs at every gate, and safeguarding your investment for decades beyond handover.

“The Borland Method—7 steps: Strategy Intensive; Concept (early builder input); Gate 1 Schematic + Round-1; Gate 2 DD + Round-2 (select builder); Contract Documentation; Gate 3 Pre-Contract; Construction & Handover.”

7‑Step Overview

A proven 7-step pathway with three cost gates. Each stage locks in clarity, protects your budget, and builds confidence before you commit.

What this guarantees

Market-tested costs, early — two aligned builders pricing at schematic and design stages.

Three no-surprises gates — budget certainty before signing.

One accountable leader — architect-led governance with weekly dashboards and strict variation protocols.

Performance verified — comfort, air quality, and energy efficiency measured, not assumed.

Your First Step

  • Understand your goals, risks, and budget framework.

  • See if our method is the right fit for your forever home.

  • If aligned, we map your pathway into Concept Design with early builder input.

Details

  • We gathering detailed information on your brief using briefing tools, assess of your site and test your budget using an aligned builder to give feedback & order‑of‑magnitude pricing so the design steers to budget early to ensure feasibility.

  • 3D model in context; planning compliance review; initial engineering & fabric build‑ups

    Round‑1 pricing + buildability advice (client‑approved early engagement)

    If required we lodge planning now

    Decision: go / pause & adjust before Design Development

  • We collaborate with your planning consultant and prepare for lodgement.
    Limitations: permits aren’t guaranteed.

  • Resolve structure, services, openings and all interiors; 3D walkthroughs; up to 2 showroom selection days

    Round‑2 pricing → select preferred builder

    Decision: go / pause & adjust before documentation

  • Detailed drawings, schedules and specifications in preparation for construction; respond to building surveyor queries; assist builder to procure building permit.

  • Curated options and finish suites; 90% of decisions locked at Design Development stage to protect budget and schedule.

  • Reconcile inclusions, allowances and clarifications with the builder.
    Decision: proceed to contract / tune package to protect budget.

  • We do not run a traditional tender. Instead, we engage two aligned builders from teh start of the design process:
    Concept feedback + early guidance on price → Gate 1 Round‑1 pricing → Gate 2 Round‑2 pricing → select preferred builder → CD → contract price → construction.
    Benefits: early market‑aligned pricing · early construction advice · relationship building · fewer variations · fewer on‑site compromises.
    Competitive tension: two aligned builders maintain competitive tension through Gate 2 (Design Development); we then appoint the preferred builder to assist with contract documentation and contract pricing. The architect remains the single point of accountability. Client builds relationship with builder prior to contract signing.

  • Indoor Air Quality: CO₂ / VOC / Moisture thresholds

    Airtightness: blower‑door testing (project‑specific target, typically under 1.0 Air Changes/ hr @50Pa)

    Thermal Stability: designed to maintain consistency whatever the weather

    Acoustics: room‑by‑room noise control targets

  • We manage the whole process including all external consultants and builders so you don’t have to. You can expect weekly dashboard during active phases · agreed response times during construction · variation protocol (priced and approved before it hits site) · issue‑tracking with clear responsibilities and due dates.

  • Full Contract Administration (comprehensive, assuming we act as clients agent): fortnightly site visits typically; claims/program/variations/defects/handover; assistance throughout build and defects‑liability period.
    Site Attendance (advisory, assuming client takes lead): monthly site with formal report; on‑site advice only.

Ready for a calm, certain process?

Our method gives you certainty at every step, performance you can measure, and an architect who remains accountable long after the ribbon is cut.